Client: Antara Koh Pte Ltd
Country: Singapore
Project Location: Jurong Island, Singapore
BMT was appointed by Antara Koh Pte Ltd to conduct a mooring analysis for the proposed Singapore LNG terminal secondary and tertiary berths at Jurong Island, Singapore.
The mooring analysis was conducted using OPTIMOOR software. The mooring arrangement layouts were provided by the client.
Scope of work for the mooring analysis was as follows:
BMT, together with Samsung C&T Corporation and Anatara Koh Pte Ltd provided offshore engineering consultancy and construction services for the Singapore LNG terminal secondary and tertiary berths at Jurong Island.
Wilmar Myanmar Port Terminals (Thilawa) limited intends to construct a modern multi-purpose international jetty at the Thilawa port. Contractor Penta-Ocean Construction Co. Ltd had appointed BMT to provide professional engineering services for this project. As part of engineering services, mooring assessment for proposed jetty structure has been carried out.
BMT was appointed by Technics Oil & Gas Ltd. to conduct a mooring analysis for an 80m LOA vessel and advice on the maximum ship size which can berth at the wharf.
BMT was appointed by Sembawang Shipyard Pte Ltd (SSPL) to carry out the mooring analysis of the vessel MT Chios during its conversion into a floating storage and offloading (FSO) facility at Karimun Shipyard, Indonesia and Sembawang Shipyard, Singapore.