A more cost-effective model for securing approvals

The cost of failing to satisfy regulators’ demands in the offshore oil and gas industry is high: project delays, reworked submissions, lost opportunity. But does the cost of successfully meeting those demands need to be as high as it is too? We believe not.

Modelling cutting piles and the dispersion of produced water may be just two inputs into a complex submission, but like all other elements, they have the ability to incur costly delays and can be costly themselves.

To answer the need for credible, accurate modelling at realistic prices, we have developed BMT Proteus. Together with the experience of our people and the integrity of our submissions, BMT Proteus helps unlock operational and decommissioning programmes in a fast, affordable way.

Explore more options with greater accuracy at lower cost

We are the creators of the code for BMT Proteus which gives us - and you - three distinct advantages

Flexibility

No project is just a 'one model run', but what are the advantages of being able to run multiple scenarios, and do so faster at lower cost?

  • Increase the number of options you can to identify the optimum approach to gaining approval whilst controlling costs.
  • Convey greater diligence to the regulator

Accuracy

Licenced modelling software is at best time-consuming or at worst impossible to adapt to the precise nature of your structure and its environment. Having developed BMT Proteus in-house, we have an intimate knowledge of the code and direct access to the equations to model different scenarios?

  • Gain greater accuracy – and so greater predictability of cost – from our ability to adapt a wide range of parameters to match your structure and environment.

Price

Consultants using third-party are forced to reflect those expensive licenses in their fees. As creators and owners of BMT Proteus, we have no licence fees to pass on.

The experience factor

As a specialist environmental consultancy supporting offshore oil and gas operators for more than 30 years, we have built up a significant knowledge bank around the ‘what’, ‘who’, ‘where’ and ‘how’ of satisfying regulators. We use that experience to take a holistic view of operations and decommissioning.

Modelling may recommend that a decommission project, for example, leave the jacket fittings in place. The value of experience, however, lies in balancing the technical findings with issues such as objections to loss of fishing areas leaving those fittings may incur.

Presenting a powerful case

A powerful report must combine technical integrity with good communication skills. Our submissions are all each quality checked against our experience of the particular hydrodynamic regime, sediment type and structure size, underwriting their technical integrity. It is, however, our experience with the regulator that allows us to get the communication as well as the science right.

  • Our familiarity with the preferences of different regulators informs the structure of all of our communications.
  • Our preferred approach – and that of many regulators – is for up-front communication to agree in advance the focus of a submission.
  • We are practised in presenting face-to-face, via phone and in written submissions.
  • Each submission is reviewed by a senior for readability.
  • Our reports contain clear, actionable recommendations.

Gain greater credibility

BMT Proteus has been trialled and approved by the UK Government's Business, Energy and Industrial Strategy committee (formerly DECC UK). Along with the reputation of BMT’s consultants with the regulators, this approval acts as powerful endorsement of your submission.

Part of the modelling support for the industry

From our own OSIS 2D and licenced 3D oil spill modelling tools, BMT Proteus is part of our commitment to support decisions making in the offshore oil and gas industry with highly credible, innovative and affordable environmental modelling.